Eyestrain from screens? Adopt original paper study — the SAP Certified - Database Administrator - SAP HANA PDF at Pass4suresVCE is easy to read, print, and annotate: 217 practice questions for the C-DBADM-2601 exam.
SAP C-DBADM-2601 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified - Database Administrator - SAP HANA |
| Exam Number: | C-DBADM-2601 |
| Real Exam Qty: | 80 |
| Certificate Validity Period: | 5 years |
| Exam Price: | USD 500 |
| Exam Format: | Multiple Response, Multiple Choice |
| Exam Duration: | 180 minutes |
| Passing Score: | 69% |
| Related Certifications: | SAP Certified - Database Administrator - SAP HANA |
| Available Languages: | German, English, Japanese |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or in-person at SAP training center |
| Pre Condition: | None |
| Official Syllabus URL: | https://training.sap.com/certification/c_dbadm_2601-sap-certified-database-administrator-sap-hana-g/ |
SAP C-DBADM-2601 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| SAP HANA Installation and Configuration | 12% | - Configure SAP HANA
|
| SAP HANA Monitoring and Troubleshooting | 12% | - Troubleshoot issues
|
| SAP HANA High Availability and Disaster Recovery | 12% | - Implement disaster recovery
|
| SAP HANA Performance Optimization | 16% | - Manage memory and resources
|
| SAP HANA System Administration | 12% | - Perform system maintenance
|
| SAP HANA Security | 12% | - Manage users and roles
|
| SAP HANA Database Administration | 12% | - Manage data
|
| SAP HANA Backup and Recovery | 12% | - Perform recovery
|
SAP Certified - Database Administrator - SAP HANA Exam FAQ — Targeted Answers
USD 500 per attempt, 69% to pass. Retakes cost the full fee, so review targeted — mark your weak spots in the 217 practice questions for the C-DBADM-2601 exam at Pass4suresVCE.
The SAP Certified - Database Administrator - SAP HANA blueprint spans 8 domains — including SAP HANA Backup and Recovery (12%), SAP HANA High Availability and Disaster Recovery (12%), SAP HANA Installation and Configuration (12%). The complete outline above lists every subtopic; our material includes the latest exam content for each.
None Eligibility rules change over time, so verify the current requirements on the official page (official C-DBADM-2601 exam page) before registering.
The SAP Certified - Database Administrator - SAP HANA is SAP's certification exam for SAP Certification Exams, at the Associate level. The certificate is your shining point — an important element in how employers evaluate you. Related credentials include SAP Certified - Database Administrator - SAP HANA.
Yes — download the free SAP Certified - Database Administrator - SAP HANA demo and check the accuracy and clearness yourself. Purchases include 365 days of free updates by email; renew afterward at 50% off.
As an electronic product, the SAP Certified - Database Administrator - SAP HANA material reaches your email about a minute after successful payment — we verify your information to avoid mistakes, and you start reviewing at once, with 24/7 help if nothing arrives within 2 hours. If you fail the corresponding C-DBADM-2601 exam within 60 days of purchase, we refund the full amount: send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam, processed within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Or exchange for two equal-value products free.
180 minutes for 80 questions. Build pacing in the Pass4suresVCE SOFT or APP test engine — simulation makes the real clock familiar.
SAP Certified - Database Administrator - SAP HANA Sample Questions:
CHALLENGE 1 - Recovery Review Configuration Traceability
The recovery review coordinator wants to accept the comparison because patient-flow reports opened successfully. The database team later confirms that the upgraded reporting system's administration record does not reflect the configuration state used during testing. Which decision best supports readiness-quality evidence?
- A. Use the comparison because report opening is sufficient evidence for operational sign-off.
- B. Update the administration record and reassess the readiness comparison against the confirmed state.
- C. Replace the upgraded system record with the SAP HANA Cloud provisioning record.
- D. Treat the missing configuration evidence as unrelated because the review focuses on report access.
Correct Answer: B 🗳️
Explanation: Only visible for Pass4suresVCE members. You can sign-up / login (it's free).
A regional educational publishing group is rehearsing migration from SAP HANA on-premises to SAP HANA Cloud. The import completes, and database explorer confirms that sample analytics queries return expected results. During validation, the administrator finds that the cloud target was monitored only during import, not during the first post-import administration cycle. The project lead wants approval because the import and query checks both passed.
The constraint is that the migration wave must prove administration readiness after the cloud target reaches the migrated operating state. The validation pattern must be reusable for later phased migration waves.
Which recommendation is most appropriate?
- A. Repeat the import because missing post-import monitoring proves that the migration content was not loaded correctly.
- B. Approve the rehearsal because the import completed and sample analytics queries returned expected results.
- C. Run and record the first post-import administration monitoring cycle for the cloud target, then approve only after the evidence passes.
- D. Defer cloud target monitoring until production cutover because query validation already confirms usability.
Correct Answer: C 🗳️
Explanation: Only visible for Pass4suresVCE members. You can sign-up / login (it's free).
CHALLENGE 3 - Freight Cloud Readiness Boundary
The project team wants to approve cloud migration planning using three facts: the SAP HANA Cloud database is provisioned, freight sample data is loaded, and on-premises cutover reports run successfully. Which validation step is still required?
- A. Stop on-premises cutover validation because the future reporting direction is cloud-based.
- B. Treat the freight sample dataset as proof that cloud monitoring and recovery evidence are complete.
- C. Approve migration planning because the three facts cover the full readiness chain.
- D. Confirm cloud administration readiness evidence for the freight sample dataset scope.
Correct Answer: D 🗳️
Explanation: Only visible for Pass4suresVCE members. You can sign-up / login (it's free).
A regional electronics distributor is validating an SAP HANA upgrade rehearsal in an on-premises environment. The database starts successfully after the upgrade, and SAP HANA cockpit shows normal availability. During administrative validation, hdbsql checks from the operations workstation fail with a client compatibility message, while cockpit-based checks continue to work. The upgrade record confirms the database revision was updated, but the workstation tooling was not reviewed after the rehearsal.
The constraint is that the administrator must confirm post-upgrade administration through the required mixed tooling before approving the production window. The team must not treat cockpit-only validation as sufficient.
Which action best completes the upgrade validation?
- A. Align the operations workstation tooling with the upgraded database requirements, rerun hdbsql validation, and record the result.
- B. Replace the command-line validation with cockpit-only checks for the production upgrade window.
- C. Approve the rehearsal because the upgraded database starts and SAP HANA cockpit checks succeed.
- D. Downgrade the database revision because hdbsql cannot connect from the operations workstation.
Correct Answer: A 🗳️
Explanation: Only visible for Pass4suresVCE members. You can sign-up / login (it's free).
CHALLENGE 2 - Restoration Simulation Monitoring Baseline
The monitoring dashboard shows acceptable daytime availability, but restoration simulation behavior varies after hours. The alert thresholds may still reflect the earlier operational reporting profile. Which action best supports a reliable UAT conclusion?
- A. Confirm threshold relevance for the restoration simulation workload before interpreting the dashboard trend.
- B. Increase all alert thresholds so the second UAT run avoids unnecessary performance warnings.
- C. Treat daytime availability as sufficient because the database remained reachable.
- D. Tune the after-hours workload first and update monitoring evidence after the release decision.
Correct Answer: A 🗳️
Explanation: Only visible for Pass4suresVCE members. You can sign-up / login (it's free).
Viewing page 1 out of 44 pages.
Viewing questions 1-5 out of 217 questions.



1137 Customer Reviews
