[Jan 04, 2022] Free SAP Certified Application Associate C_TS422_2020 Exam Question [Q72-Q94]

Share

[Jan 04, 2022] Free SAP Certified Application Associate C_TS422_2020 Exam Question

C_TS422_2020 dumps & SAP Certified Application Associate sure practice dumps


C_TS422_2020 Exam Certification Details:

Sample Questions: SAP C_TS422_2020 Exam Sample Question
Languages:English
Exam:80 questions
Cut Score:56%


SAP C_TS422_2020 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.


 

NEW QUESTION 72
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

  • A. Production version
  • B. Repetitive manufacturing profile
  • C. Cost collector
  • D. Bil1 of material

Answer: A

 

NEW QUESTION 73
How Is the bill of material (BOM) exploded when you use a BOM explosion number?

  • A. With respect to a common change status for product and each assembly
  • B. With respect to defined separate key dates for product and each assembly
  • C. With respect to a defined separate change status for product and each assembly
  • D. With respect to a common key date for product and each assembly

Answer: B

 

NEW QUESTION 74
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.

  • A. Multi core processors enabling parallelism of tasks
  • B. Big and affordable memory
  • C. Wide adoption of web standards such as Service oriented architecture
  • D. Advances in the three-tier architecture approach
  • E. Capability to add to server landscape and scale

Answer: A,C,E

 

NEW QUESTION 75
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

  • A. Batch process are required to keep OLTP and OLAP in sync
  • B. Multiple copies of the data exist
  • C. Only the OLAP system has a predefined subset of the data
  • D. The OLAP system needs to write back the data to the OLTP system
  • E. Only the OLAP system has the latest data

Answer: A,B,C,D

 

NEW QUESTION 76
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.

  • A. Routing header
  • B. Bill of material
  • C. Work center
  • D. Material master

Answer: B,D

 

NEW QUESTION 77
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.

Answer: A

 

NEW QUESTION 78
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

  • A. Lot size
  • B. Maximum stock level
  • C. Purchase orders
  • D. Safety stock

Answer: A,D

 

NEW QUESTION 79
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a handling resource in the location master and goods receipt time in the mater all master.
  • B. Model a resource inbound in the location master.
  • C. Model a transportation resource in the location master.
  • D. Model a separate resource inthe production data structure.

Answer: A,C

 

NEW QUESTION 80
What is the first step in the MRP run?

  • A. BOM explosion
  • B. Source determination
  • C. Net requirements calculation
  • D. Lot size calculation

Answer: C

 

NEW QUESTION 81
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a negative planning horizon in the strategy profile.
  • B. Specify a positive planning horizon in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a negative offset time in the strategy profile.

Answer: D

 

NEW QUESTION 82
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Setup time
  • C. Float after production
  • D. Total replenishment lead time

Answer: A,C

 

NEW QUESTION 83
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.

  • A. A user can trigger material staging via mass processing (transaction COHV).
  • B. A user can schedule a background job to release production orders (transaction COOIS).
  • C. A user trigger printing of shop floor paper manually (transaction CO02).
  • D. A user trigger material availability check via mass processing (transaction COHV)

Answer: A

 

NEW QUESTION 84
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Reduce the planning window.
  • B. Form optimum sequences to reduce setup times.
  • C. Select an alternative mode on a resource.
  • D. Execute a new production planning run.
  • E. Adjust the available capacity.

Answer: B,C,E

 

NEW QUESTION 85
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a production order.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a reservation.

Answer: D

 

NEW QUESTION 86
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.

  • A. Vendor
  • B. Organization
  • C. Customer
  • D. Group
  • E. Person

Answer: B,D,E

 

NEW QUESTION 87
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order is converted to a production order.
  • B. The planned order's component availability is checked
  • C. The planned order generates capacity requirements.
  • D. The planned order's components are copied from the picking list.

Answer: C

 

NEW QUESTION 88
What is the purpose of collective orders?

  • A. To post production costs ona cost collector instead of the production order
  • B. To manage production orders for an entirefinished product on multiple levels
  • C. To post any component withdrawals single back flush with order confirmation
  • D. To combine order management of co-products and by-products with the main product

Answer: B

 

NEW QUESTION 89
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?

  • A. The requirements date occurs before that of a firmed planned receipt
  • B. The requirements date occurs that of a firmed planned receipt
  • C. The requirement no longer exists
  • D. A firmed planned receipt cannot be rescheduled

Answer: A

 

NEW QUESTION 90
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.

  • A. SAP C/4HANA
  • B. SAP Field glass
  • C. SAP Ariba
  • D. SAP Concur
  • E. SAP SuccessFactors

Answer: B,C,D

 

NEW QUESTION 91
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Setup matrix
  • B. Resource network
  • C. Work center hierarchy
  • D. Operation network

Answer: C

 

NEW QUESTION 92
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.

  • A. Default values for the item status
  • B. Maximum allowed low-level code
  • C. Default unit of measure
  • D. Allowed material type

Answer: A,D

 

NEW QUESTION 93
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.

  • A. Monitor Production Orders Fiori app
  • B. Material Coverage Fiori app
  • C. Flow manufacturing
  • D. Lock-free inventory movements
  • E. Rough-cut capacity planning

Answer: A,B,D

 

NEW QUESTION 94
......