
[Jan 15, 2022] C-TS422-1909 Test Engine files, C-TS422-1909 Dumps PDF
Latest SAP C-TS422-1909 PDF and Dumps (2022) Free Exam Questions Answers
SAP C-TS422-1909 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
C-TS422-1909 Exam Certification Details:
| Cut Score: | 55% |
| Level: | Associate |
| Sample Questions: | SAP C-TS422-1909 Exam Sample Question |
| Exam: | 80 questions |
| Duration: | 180 mins |
| Languages: | German, English, French, Chinese |
NEW QUESTION 17
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. Net requirements calculation
- B. Lot size calculation
- C. Source determination
- D. BOM explosion
Answer: A
NEW QUESTION 18
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process order
Control recipe
PI sheet
Process message - B. Process message
Control recipe
Process order
Process message
PI sheet - C. Process order
Control recipe
Process message
PI sheet - D. Control recipe
Process order
PI sheet
Answer: A
NEW QUESTION 19
Which process order function uses a resource network?
Please choose the correct answer.
Response:
- A. Resource selection
- B. Capacity leveling
- C. Capacity planning
- D. Resource scheduling
Answer: A
NEW QUESTION 20
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple production versions are maintained for one product
- B. When alternate resources are used within one operation
- C. When multiple planned orders exists in one resource
- D. When multiple operations are maintained for one product
Answer: B
NEW QUESTION 21
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Orders (dispatched) chart
- D. Capacity requirements chart
Answer: A,D
NEW QUESTION 22
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:
- A. In the requirements class
- B. In the plant parameters
- C. In the material master
- D. In the MRP group
Answer: C,D
NEW QUESTION 23
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 24
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Multidimensional Reporting client (MDRC)
- B. ABAP Managed Core Data Services (CDS)
- C. Smart Business Cockpit
- D. HANA Live
Answer: B
NEW QUESTION 25
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Kanban
- B. Production order release
- C. Material requirements planning
- D. Back flushing
Answer: C
NEW QUESTION 26
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Response:
- A. Cost collector
- B. Repetitive manufacturing profile
- C. Bill of material
- D. Production version
Answer: D
NEW QUESTION 27
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:
- A. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
- B. Manually firm all planned orders for materials within the replenishment lead time of the material
- C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- D. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
Answer: A,C
NEW QUESTION 28
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
- A. Purchase orders
- B. Stock transfers
- C. Transfers from batch to batch
- D. Planned orders
- E. Collective orders
Answer: A,B,C
NEW QUESTION 29
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Purchasing Info Record
- B. Production Version
- C. Contract
- D. Selection Method
Answer: B
NEW QUESTION 30
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. Full
- C. In use
- D. Empty
Answer: B
NEW QUESTION 31
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Parallel processing across servers
- B. MRP list
- C. Planning horizon
- D. Net change planning
Answer: D
NEW QUESTION 32
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Planning mode (bucket/sequence)
- B. Direction (forward/backward)
- C. Fixed pegging (on/off)
- D. Finiteness level (0...1)
- E. Scheduling control (finite/infinite)
Answer: A,B,E
NEW QUESTION 33
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Integrated Business Planning (IBP)
- C. Material Requirements Planning (MRP)
- D. Capacity Requirements Planning (CRP)
Answer: A,B
NEW QUESTION 34
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Checking rule and group must be assigned.
- C. Indicator Relevant for finite scheduling must be set.
- D. PRT Availability check must be set.
Answer: A,C
NEW QUESTION 35
......
Pass Your SAP Certified Application Associate C-TS422-1909 Exam on Jan 15, 2022 with 91 Questions: https://www.pass4suresvce.com/C-TS422-1909-pass4sure-vce-dumps.html