Real EMC D-PM-MN-23 Exam Dumps with Correct 90 Questions and Answers [Q47-Q66]

Share

Real EMC D-PM-MN-23 Exam Dumps with Correct 90 Questions and Answers

Valid D-PM-MN-23 Test Answers & EMC D-PM-MN-23 Exam PDF

NEW QUESTION # 47
A PowerMax array with eNAS experiences a failure of an I/O module that is configured to a Data Mover (DM).
Which program is used to fail the DM over to the standby DM before replacing the I/O module?

  • A. Symmwin
  • B. Unisphere for PowerMaxb
  • C. Unisphere for VNX
  • D. Simplified Symmwin

Answer: C


NEW QUESTION # 48
A system administrator requires site-specific details such as system code level, serial number, model, and spare service type.
Which View Block in Symplified Symmwin provides these details?

  • A. System Management
  • B. Site Note
  • C. Site Info
  • D. Tasks

Answer: C


NEW QUESTION # 49
How do PowerMax 2000 and 8000 models differ in terms of local RAID options?

  • A. They offer the same RAID options
  • B. PowerMax 8000 offers more flexible RAID configurations
  • C. PowerMax 8000 supports only RAID 5 and 6
  • D. PowerMax 8000 offers more flexible RAID configurations

Answer: B


NEW QUESTION # 50
Which of the following is a hardware component unique to PowerMax 8000 compared to PowerMax
2000?

  • A. Dual in-line memory modules (DIMMs)
  • B. NVMe SSDs
  • C. Enhanced flash modules (EFMs)
  • D. More powerful CPUs

Answer: C


NEW QUESTION # 51
What type of RAID configuration does PowerMax 8500 support?

  • A. Only proprietary Dell EMC RAID configurations
  • B. Flexible RAID configurations, including RAID 5, 6, and Diamond
  • C. RAID 6 and RAID 10 only
  • D. RAID 1 and RAID 5 only

Answer: B


NEW QUESTION # 52
What can be used to prepare a service laptop to connect to a PowerMax 8000 array that does not have a KVM?

  • A. CS SSH Tunnel Manager
  • B. IP Switcher
  • C. Remotely Anywhere
  • D. Simplified Symmwin

Answer: B


NEW QUESTION # 53
Which two PowerMax hardware components require the use of ESD tools during replacement?

  • A. I/O Modules
  • B. DIMMS
  • C. Power Supplies
  • D. SPS

Answer: A,D


NEW QUESTION # 54
What is the maximum number of DMEs that can be installed in system bay one of an unbalanced PowerMax 8500 system?

  • A. Two
  • B. Three
  • C. Four
  • D. Six

Answer: C


NEW QUESTION # 55
Which two front-end emulations are available for PowerMax 8000 arrays?
(Select 2)

  • A. FA
  • B. DX
  • C. DN
  • D. SE

Answer: A,B


NEW QUESTION # 56
What should be ensured before accessing PowerMax 2000 and 8000 arrays for maintenance purposes?

  • A. Proper user authentication and authorization
  • B. The latest software version is installed
  • C. The arrays are disconnected from the power source
  • D. The arrays are in a specific maintenance mode

Answer: A


NEW QUESTION # 57
What role does PowerMaxOS 10 play in optimizing storage performance?

  • A. Automated performance optimization
  • B. Periodic performance reporting
  • C. Manual tuning of performance settings
  • D. User-driven performance analysis

Answer: A


NEW QUESTION # 58
Refer to the exhibit:

What node FRU component is indicated?

  • A. Boot Drive
  • B. Back End Module
  • C. Data Reduction Offload Module
  • D. Fabric Attach Module

Answer: C


NEW QUESTION # 59
What is a key advantage of using Simplified Symmwin for FRU procedures in PowerMax systems?

  • A. It automatically updates the system firmware
  • B. It eliminates the need for manual intervention
  • C. It performs system backups before any procedure
  • D. It provides guided, step-by-step instructions

Answer: D


NEW QUESTION # 60
Refer to the exhibit.

What does "DRIVE-A:1" represent?

  • A. Physical location of the drive in the bay
  • B. Drive type and spare drive location
  • C. Drive type and number
  • D. Physical location of the drive in the DAE

Answer: D


NEW QUESTION # 61
Which feature of PowerMax 8500 caters to the demand for rapid data access?

  • A. High-speed caching
  • B. Extended disk capacity
  • C. Additional external storage
  • D. Manual data retrieval processes

Answer: A


NEW QUESTION # 62
What is an important step to perform after replacing a FRU in a PowerMax system? (Choose two)

  • A. Running a full system diagnostic test
  • B. Verifying the successful integration of the new FRU
  • C. Reconfiguring the entire system
  • D. Updating system documentation

Answer: A,B


NEW QUESTION # 63
Which slots are reserved for Flash modules in PowerMax 2000 and 8000 single engine arrays?

  • A. PowerMax 2000: Slots 0 and 6
    PowerMax 8000: Slots 0, 1, 6, and 7
  • B. PowerMax 2000: Slots 0 and 1
    PowerMax 8000: Slots 0, 1, 9, and 10
  • C. PowerMax 2000: Slots 0 and 6
    PowerMax 8000: Slots 0, 1, 9, and 10
  • D. PowerMax 2000: Slots 0 and 1
    PowerMax 8000: Slots 0, 1, 6, and 7

Answer: A


NEW QUESTION # 64
How many vault drives are installed per node pair on a PowerMax 8500?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 65
Which PowerMax model is designed for high-density storage in a smaller footprint?

  • A. PowerMax 8000
  • B. PowerMax 8500
  • C. PowerMax 2000
  • D. PowerMax 2500

Answer: C


NEW QUESTION # 66
......

D-PM-MN-23 Exam Questions and Valid PMP Dumps PDF: https://www.pass4suresvce.com/D-PM-MN-23-pass4sure-vce-dumps.html

EMC D-PM-MN-23 Certification Real 2025 Mock Exam: https://drive.google.com/open?id=1-DXG1TnwsDwe-ozssfuX_aG0szkyTuzi