[2022] Pass ISQI CTFL_001 Exam in First Attempt Easily
The Most Efficient CTFL_001 Pdf Dumps For Assured Success
NEW QUESTION 193
Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives? 1 credit
- A. Lines of code written per developer per day
- B. Average number of days between defect discovery and resolution
- C. Percentage of test effort spent on regression testing
- D. Percentage of requirements covered
Answer: D
NEW QUESTION 194
System testing is:
- A. Triggered by modifications, migration or retirement of the software system.
- B. The responsibility of the users of a system.
- C. Used to search for defects in software modules that are separately testable.
- D. Concerned with the behavior of a whole system/product as defined by the scope of a development project.
Answer: D
NEW QUESTION 195
Which of the following would NOT be a common metric used for monitoring test preparation and execution?
- A. Percentage of tasks complete in test environment preparation
- B. Percentage of planned test cases designed
- C. Number of Test cases passed and failed
- D. Number of test plan review comments
Answer: B
NEW QUESTION 196
How does software testing contribute to the quality of delivered software?
- A. By detecting and removing all the defects in the delivered code and ensuring that all tests adhere to the quality standards set for the project
- B. By measuring reliability of the software and ensuring that it is always above 99.99%
- C. By detecting all deviations from coding good practice and ensuring that these are corrected
- D. By identifying root causes of defects from past projects and using the lessons learned to improve processes and thus help to reduce the defect count
Answer: D
NEW QUESTION 197
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
a.Any deviation from the procedures described in the test
b.strategy document
c.The overall estimated costs, timescales and resource
d.requirements
e.A detailed schedule of testing activities
f.The development deliverables to be tested
g.Which test staff members (names) will be involved and when
h.Level of requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit
- A. b
- B. f
- C. e
- D. c
- E. d
- F. a
Answer: C,D
Explanation:
Topic 10, Scenario 10, V3 "Online Application"
The cancellation of a current major development project has released resources. The development manager has decided to respond to his own request to tender and has proposed an in-house development with the use of a Rapid Application Development (RAO) approach.
NEW QUESTION 198
A bug or defect is:
- A. A mistake made by a person;
- B. The result of a failure, which may lead to an error?
- C. The result of an error or mistake;
- D. A run-time problem experienced by a user;
Answer: C
NEW QUESTION 199
Which of the following would you expect to see in the master test plan? 1 credit
- A. A description of how the test cases are cross-referenced to requirements in the test management tool.
- B. A detailed identification of the resources that will carry out structural testing in the first iteration.
- C. A list of the names of the testers who will carry out the performance testing for the final iteration.
- D. The test approach that will be applied at system integration testing.
Answer: D
Explanation:
Topic 5, Scenario 4, V2 "Test Management Tool"
The project situation after 11 months is:
- The first increment was released one week late but contained sufficient functionality to be declared fit for purpose'. However, there were 20 outstanding incidents deferred to increment two.
- The amount of voluntary overtime worked PV the test team has reduced the second Increment slippage to just 3 weeks.
- There is talk of reducing the scope of requirements. The purpose of this is to first deliver the application with support for manual testing and then to provide a delivery * weeks later to resolve any remaining points and provide support for automated testing (i.e. the link to the capture-replay tool).
- Concerns have been expressed by a section of the user community, that in some places the usability is very poor.
NEW QUESTION 200
What benefits do static analysis tools have over test execution tools?
- A. Static analysis tools are particularly effective for regression testing.
- B. Static analysis tools can be used before code is written.
- C. Static analysis tools test that the delivered code meets business requirements.
- D. Static analysis tools find defects earlier in the life cycle.
Answer: D
NEW QUESTION 201
In general, why is it NOT a good idea to estimate the testing effort based only on a percentage of development effort? Identify THREE valid reasons. 1 credit
- A. In general bottom-up estimation is always better than top-down estimation.
- B. The percentage based technique only applies to the V life cycle model.
- C. Using the same percentage every time does not address the level of risk of the application to be tested.
- D. The maturity of the organization, e.g. the quality of the test basis, quality of development testing, configuration management, availability of test tools, also influence the effort needed for testing.
- E. The result is almost always a too low estimate for the required test effort
- F. The quality of the development estimate may be poor.
- G. It builds on large set of historical data
Answer: C,D,F
NEW QUESTION 202
The Cambrian Pullman Express has special ticketing requirements represented by the partial decision table below.
Refer to the exhibit
Carol has a student railcard and is travelling on a Flexible Standard Class ticket. James has a senior railcard and is travelling on a super saver ticket. Which of the options represents the correct actions for these two test cases?
- A. Carol is OK to travel; James cannot use the service
- B. Carol is eligible to upgrade; James cannot use the service
- C. Carol is OK to travel; James is eligible for an upgrade
- D. Carol and James are both eligible to upgrade
Answer: B
NEW QUESTION 203
Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit
- A. No complete requirements specification
- B. Time-boxing
- C. Project management and control
- D. Re-usable test scripts for (automated) regression testing
Answer: C
NEW QUESTION 204
The development manager is managing the review of the responses received from bidders, and has asked the in-house test manager to provide a review checklist for the test management aspects of the responses. Which of the following checkpoints would be appropriate? 2 credits
- A. The bidder's project test plan depicts a phased implementation with later delivery dates to be confirmed and states that test deliverables will be developed using IEEE 829 as a guide.
- B. The bidder's test policy should enforce that incident management fully conforms to IEEE 1044.
- C. The bidder's project strategy shows that the data content of all the test environments conforms to EU standards.
- D. The bidder's test plan shows that the application will be delivered for acceptance in six months time.
Answer: A
Explanation:
Topic 17, Scenario 10, V2 "Online Application"
While waiting for the responses, the test manager has been asked to prepare test plans to validate the software application delivered by the successful bidder.
NEW QUESTION 205
Which of the following would NOT be a typical target of testing support tools?
- A. Automate activities that cannot be executed manually
- B. Automate repetitive tasks
- C. Automating repetitive inspections
- D. Automate activities that require significant resources when done manually
Answer: C
NEW QUESTION 206
Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit
- A. No complete requirements specification
- B. Time-boxing
- C. Project management and control
- D. Re-usable test scripts for (automated) regression testing
Answer: C
Explanation:
Topic 19, Scenario 11 "Incident Management"
The following is the current incident handling process in used at the company.
Step 1: Incident is documented in the incident Tile with the following information:
- Software module or area where the fault occurred
- Who has reported the fault
- Hardware configuration used for the test that found the fault
- The sequential incident number (1 greater than the last one recorded) Step 2: Developer assigned to fix the fault Step 3: Developer fixes the fault
Step 4: Developer signs off the incident as closed, and it is then removed from the incident file
NEW QUESTION 207
Which of the following test organizations has the highest level of independence?
- A. Independent testers from the user community
- B. Code tested by another developer from the development team
- C. Independent testers within the development teams
- D. Independent test specialists for specific test types, such as usability, performance or certification test specialists
Answer: D
NEW QUESTION 208
Faults found by users are due to..?
- A. Poor software and poor testing
- B. Insufficient time for testing
- C. Bad luck
- D. Poor quality software
Answer: A
NEW QUESTION 209
Which of the following would typically be identified using static analysis by tools? [K1]
- A. Memory leakage
- B. Spelling mistake on an error message
- C. A variable set to the wrong value
- D. A potential infinite loop
Answer: D
NEW QUESTION 210
......
We offers you the latest free online CTFL_001 dumps to practice: https://www.pass4suresvce.com/CTFL_001-pass4sure-vce-dumps.html