Get ready to pass the C_TS422_1909 Exam right now using our SAP Certified Application Associate Exam Package [Q16-Q40]

Share

 Get ready to pass the C_TS422_1909 Exam right now using our SAP Certified Application Associate  Exam Package

A fully updated 2022 C_TS422_1909 Exam Dumps exam guide from training expert Pass4suresVCE


SAP C_TS422_1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


SAP C_TS422_1909 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.


 

NEW QUESTION 16
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:

  • A. Quota arrangement
  • B. Costs
  • C. Delivery date
  • D. Component availability
  • E. Vendor rating

Answer: A

 

NEW QUESTION 17
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:

  • A. Use optimization with respect to set-up times
  • B. Use rescheduling with an alternative mode
  • C. Use a bucket-oriented capacity check
  • D. Use DS heuristic "Schedule Sequence"
  • E. Use multilevel MRP run for the products on the resource

Answer: A,B,D

 

NEW QUESTION 18
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Orders (dispatched) chart
  • B. Capacity requirements chart
  • C. Work center capacities chart
  • D. Order (pool) chart

Answer: B,C

 

NEW QUESTION 19
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 20
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:

  • A. By eliminating inventory tables
  • B. By eliminating fields for different stock types
  • C. By eliminating material master tables
  • D. By eliminating hybrid tables
  • E. By eliminating inventory history tables

Answer: A,B,E

 

NEW QUESTION 21
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. High product stability
  • B. Low product complexity
  • C. Low product stability
  • D. High product complexity

Answer: A,B

 

NEW QUESTION 22
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:

  • A. Smart Business Cockpit
  • B. ABAP Managed Core Data Services (CDS)
  • C. Multidimensional Reporting client (MDRC)
  • D. HANA Live

Answer: B

 

NEW QUESTION 23
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Material Requirements Planning (MRP)
  • B. Integrated Business Planning (IBP)
  • C. Supply Chain Management (SCM)
  • D. Capacity Requirements Planning (CRP)

Answer: B,C

 

NEW QUESTION 24
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:

  • A. Work center hierarchy
  • B. BOM status
  • C. Lot sizes
  • D. Task list group number
  • E. Validity dates

Answer: B,C,E

 

NEW QUESTION 25
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Processing time
  • B. Floating time
  • C. Queue time
  • D. Tear down time
  • E. Move time

Answer: B,C,E

 

NEW QUESTION 26
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Engineering change management
  • B. Planning
  • C. Inspection during production
  • D. Implementation

Answer: B,D

 

NEW QUESTION 27
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:

  • A. Expected goods receipt
  • B. Yard Management
  • C. Handling Unit Management
  • D. Labor Management
  • E. Slotting

Answer: A,D,E

 

NEW QUESTION 28
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:

  • A. They can be created automatically during month end process.
  • B. They can be used for repetitive manufacturing.
  • C. They can be used for manufacturing with collective orders.
  • D. They can be applied to make-to-stock production order.

Answer: B,D

 

NEW QUESTION 29
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:

  • A. Receiver-sender relationships
  • B. Process instructions
  • C. Batch determination selection conditions
  • D. Batch where-used list

Answer: A,D

 

NEW QUESTION 30
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
Response:

  • A. By providing cross-plant planning and deployment
  • B. By providing future demands from demand figures in the past
  • C. By providing multilevel material requirements planning
  • D. By providing replenishment proposals with exact times

Answer: D

 

NEW QUESTION 31
When do you use variant bills of materials (BOMB)?

  • A. When multiple material is have similar BOMB
  • B. When a material has multiple BOMB
  • C. When a material has a configurable BOM
  • D. When multiple material also have the same BOM

Answer: D

 

NEW QUESTION 32
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:

  • A. Control cycle
  • B. Production supply area
  • C. Kanban container
  • D. Rate routing

Answer: A

 

NEW QUESTION 33
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by product costing to determine how costs are rolled up.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by ATP to determine the priority of alternative components.

Answer: A,B

 

NEW QUESTION 34
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:

  • A. Reduction of the capacity requirements
  • B. Archiving of backflush documents
  • C. Posting of production costs to cost collector
  • D. Staging of components for the next order in the sequence

Answer: B,C

 

NEW QUESTION 35
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Individual/Collective Indicator
  • B. Mixed MRP indicator
  • C. Dependent Requirements indicator
  • D. Storage Location MRP Indicator

Answer: B

 

NEW QUESTION 36
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP creates capacity requirements without checking the capacity of a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Answer: B

 

NEW QUESTION 37
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:

  • A. Real time decision support
  • B. Comparison of current data with historical data to identify trends
  • C. Strategic analysis
  • D. Automatic update of story boards

Answer: A,C

 

NEW QUESTION 38
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Backflushing
  • B. Transfer Order
  • C. Kanban
  • D. Picking list

Answer: D

 

NEW QUESTION 39
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Net change planning
  • B. MRP list
  • C. Planning horizon
  • D. Parallel processing across servers

Answer: A

 

NEW QUESTION 40
......