Get ready to pass the C_TS422_1909 Exam right now using our SAP Certified Application Associate Exam Package
A fully updated 2022 C_TS422_1909 Exam Dumps exam guide from training expert Pass4suresVCE
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
NEW QUESTION 16
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:
- A. Quota arrangement
- B. Costs
- C. Delivery date
- D. Component availability
- E. Vendor rating
Answer: A
NEW QUESTION 17
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:
- A. Use optimization with respect to set-up times
- B. Use rescheduling with an alternative mode
- C. Use a bucket-oriented capacity check
- D. Use DS heuristic "Schedule Sequence"
- E. Use multilevel MRP run for the products on the resource
Answer: A,B,D
NEW QUESTION 18
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Orders (dispatched) chart
- B. Capacity requirements chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: B,C
NEW QUESTION 19
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 20
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:
- A. By eliminating inventory tables
- B. By eliminating fields for different stock types
- C. By eliminating material master tables
- D. By eliminating hybrid tables
- E. By eliminating inventory history tables
Answer: A,B,E
NEW QUESTION 21
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product stability
- B. Low product complexity
- C. Low product stability
- D. High product complexity
Answer: A,B
NEW QUESTION 22
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Smart Business Cockpit
- B. ABAP Managed Core Data Services (CDS)
- C. Multidimensional Reporting client (MDRC)
- D. HANA Live
Answer: B
NEW QUESTION 23
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Material Requirements Planning (MRP)
- B. Integrated Business Planning (IBP)
- C. Supply Chain Management (SCM)
- D. Capacity Requirements Planning (CRP)
Answer: B,C
NEW QUESTION 24
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Work center hierarchy
- B. BOM status
- C. Lot sizes
- D. Task list group number
- E. Validity dates
Answer: B,C,E
NEW QUESTION 25
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
- A. Processing time
- B. Floating time
- C. Queue time
- D. Tear down time
- E. Move time
Answer: B,C,E
NEW QUESTION 26
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Inspection during production
- D. Implementation
Answer: B,D
NEW QUESTION 27
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:
- A. Expected goods receipt
- B. Yard Management
- C. Handling Unit Management
- D. Labor Management
- E. Slotting
Answer: A,D,E
NEW QUESTION 28
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
- A. They can be created automatically during month end process.
- B. They can be used for repetitive manufacturing.
- C. They can be used for manufacturing with collective orders.
- D. They can be applied to make-to-stock production order.
Answer: B,D
NEW QUESTION 29
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:
- A. Receiver-sender relationships
- B. Process instructions
- C. Batch determination selection conditions
- D. Batch where-used list
Answer: A,D
NEW QUESTION 30
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
Response:
- A. By providing cross-plant planning and deployment
- B. By providing future demands from demand figures in the past
- C. By providing multilevel material requirements planning
- D. By providing replenishment proposals with exact times
Answer: D
NEW QUESTION 31
When do you use variant bills of materials (BOMB)?
- A. When multiple material is have similar BOMB
- B. When a material has multiple BOMB
- C. When a material has a configurable BOM
- D. When multiple material also have the same BOM
Answer: D
NEW QUESTION 32
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:
- A. Control cycle
- B. Production supply area
- C. Kanban container
- D. Rate routing
Answer: A
NEW QUESTION 33
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used in MRP to determine the sequence in which materials are planned.
- B. It is used by product costing to determine how costs are rolled up.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION 34
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Reduction of the capacity requirements
- B. Archiving of backflush documents
- C. Posting of production costs to cost collector
- D. Staging of components for the next order in the sequence
Answer: B,C
NEW QUESTION 35
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Individual/Collective Indicator
- B. Mixed MRP indicator
- C. Dependent Requirements indicator
- D. Storage Location MRP Indicator
Answer: B
NEW QUESTION 36
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP creates capacity requirements without checking the capacity of a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
Answer: B
NEW QUESTION 37
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:
- A. Real time decision support
- B. Comparison of current data with historical data to identify trends
- C. Strategic analysis
- D. Automatic update of story boards
Answer: A,C
NEW QUESTION 38
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Backflushing
- B. Transfer Order
- C. Kanban
- D. Picking list
Answer: D
NEW QUESTION 39
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Net change planning
- B. MRP list
- C. Planning horizon
- D. Parallel processing across servers
Answer: A
NEW QUESTION 40
......