NEW QUESTION 18
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:
- A. The ATP category for restricted-use stock
- B. The checking group from the material master
- C. The checking control for the order type
- D. The checking rule from the business application
Answer: B,D
NEW QUESTION 19
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Maximum allowed low-level code
- B. Default values for the item status
- C. Allowed material type
- D. Default unit of measure
Answer: C
NEW QUESTION 20
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the MRP controller
- B. In the production order type
- C. In the production version
- D. In the routing
- E. In the bill of materials (BOM)
Answer: A,B,D
NEW QUESTION 21
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:
- A. Elimination of document index tables
- B. Elimination of output condition tables
- C. Elimination of customer master tables
- D. Elimination of LIS tables for rebates
- E. Elimination of status tables
Answer: A,C,E
NEW QUESTION 22
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Finiteness level (0...1)
- C. Planning mode (bucket/sequence)
- D. Fixed pegging (on/off)
- E. Direction (forward/backward)
Answer: A,C,E
NEW QUESTION 23
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Kanban
- B. Production order release
- C. Material requirements planning
- D. Back flushing
Answer: C
NEW QUESTION 24
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the total production lead time for along production line
- C. To provide timely updates of inventory management for the staged components
- D. To stage different components for a production line simultaneously
Answer: A,C
NEW QUESTION 25
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> Plant Settings -> MRP Group
- B. MRP Group -> Material Master -> Plant Settings
- C. Plant Settings -> MRP Group -> Material Master
- D. Material Master -> MRP Group -> Plant Settings
Answer: D
NEW QUESTION 26
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
- A. With respect to a common change status for product and each assembly
- B. With respect to defined separate key dates for product and each assembly
- C. With respect to a common key date for product and each assembly
- D. With respect to a defined separate change status for product and each assembly
Answer: B
NEW QUESTION 27
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Routing header
- D. Bill of material
Answer: B,D
NEW QUESTION 28
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. For production lines with short lead times
- B. You require an up-to-date inventory for components
- C. When you need to determine the work in progress
- D. When goods issues can wait for final confirmation
Answer: C,D
NEW QUESTION 29
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The planning strategy is infinite.
- B. The Change Planning Direct on indicator is set.
- C. Alternative resources are fully occupied.
- D. The work center has several individual capacities.
Answer: A,D
NEW QUESTION 30
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Reduction of the capacity requirements
- B. Archiving of backflush documents
- C. Posting of production costs to cost collector
- D. Staging of components for the next order in the sequence
Answer: B,C
NEW QUESTION 31
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.
- A. Model a handling resource in the location master and goods receipt time in the mater all master.
- B. Model a resource inbound in the location master.
- C. Model a transportation resource in the location master.
- D. Model a separate resource in the production data structure.
Answer: A,C
NEW QUESTION 32
When do you use variant bills of materials (BOMB)?
- A. When multiple material is have similar BOMB
- B. When a material has multiple BOMB
- C. When a material has a configurable BOM
- D. When multiple material also have the same BOM
Answer: D
NEW QUESTION 33
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
- A. The code is written in SQL Script
- B. Data is read sequentially from the database tables
- C. It uses the same BAdis as classic MRP
- D. It is executed on the database server
Answer: A,D
NEW QUESTION 34
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Individual/Collective Indicator
- B. Mixed MRP indicator
- C. Dependent Requirements indicator
- D. Storage Location MRP Indicator
Answer: B
NEW QUESTION 35
Where do you maintain the duration of a product on operation?
- A. Routing
- B. Bill of material (BOM)
- C. Material master
- D. Work instructions
Answer: A
NEW QUESTION 36
......
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |